“I don't think there was ever a situation that occurred, even though we over-filled certain areas, that there was a threat to public health and safety.”
“More bang for your buck. So we could potentially remove 80- to 100-thousand tons from our waste stream, versus mixed recyclable is only estimated at 24,000 tons.”
“We haven't gotten to that period where we can stop the pumps from going on, and the water from coming through the force main and do the repair. I know we need to do a more thorough inspection and maintenance program also, not just replace pipe.”
“We're going to continue the patching of the pipes where there are cracks. Where we can, we're going to put a sleeve around it. Then, we're going to pour the concrete jacket.”